Abstract

Seismic Characterization of Harmonically Induced Power Kinetic Assessment in the Underground:
2026-10-07 to 2026-11-13
The world’s tallest wind turbine is being built in Schipkau, Brandenburg. However, since this turbine is being constructed as a 4-point steel lattice truss—unlike other turbines—we expect entirely different vibration characteristics and, consequently, different dominant frequencies for the seismic background noise. In the first measurement in 2026, the baseline will be measured to characterize the noise from the existing wind farm. Further campaigns are planned for 2027.

Related People

Person Institute
Martin Zeckra (PI) Universitaet zu Koeln
Lutz Sonnabend (Coapplicant) Landesamt für Umwelt, Landwirtschaft und Geologie (LfULG)

Used Equipment

Device Amount
Cube3 intern 20
3-C Geophone 20

Location

[51.508509° N, 13.86302° E]